site stats

Sub base ton to m3

WebHow to Convert Ton Register to Cubic Meter. 1 ton reg = 2.8316846592 m^3. 1 m^3 = 0.3531466672 ton reg. Example: convert 15 ton reg to m^3: 15 ton reg = 15 × 2.8316846592 m^3 = 42.475269888 m^3. Webv m³ = v gal × vcf (2) Now, dividing the equation (1) by the equation (2), we get. mkg vm³ = mlb × mcf vgal × vcf, or. mkg vm³ = mlb vgal × mcfvcf, but mkg vm³ is, by definition, the …

Breedon Golden Amber Gravel FAQs - Breedon Special Aggregates

WebHow much does 1 tonne cover? One tonne will cover approximately 8sqm laid at our recommended finished compacted thickness of 50mm. This equates to a bulk bag coverage of 6.4sqm approximately per bag. These calculations build in a 10% wastage factor. What is the density of Breedon Gravel? 2.2 tonnes per compacted cubic metre. get off right now https://bdmi-ce.com

Mot Type 1 Sub Base - Littler Bulk Haulage

WebMOT Type 1 Sourced from our Gill Mill and Duns Tew quarries, MOT Type I Limestone is ideal for oversite, trench and sub-base in the construction of highways and carparks. Mot Type 1 is simply crushed Limestone that meets the requirement of the Department of Transport Specification for Highway Works, clause 803. WebYou will need: 935.00 mini bags of this aggregate type. The exact conversion depends on a number of factors beyond our control, for example moisture, method & degree of … WebMOT Type 1. Finishes a surface before asphalt, shingle, concrete, block paving. Crushed to provide a stable sub-base for road surfaces and pathways. The mixture of solids and fines … get off private browsing in bing

M³ to tonnes converter

Category:MOT Type 1 0-40 mm Sub Base - Gravel Base

Tags:Sub base ton to m3

Sub base ton to m3

Type 1 Sub Base SWH Clause 803 (Formerly MOT) - Soils&Stone

Web1 m^3 = 0.3531466672 ton reg 1 ton reg = 2.8316846592 m^3 Example: convert 15 m^3 to ton reg: 15 m^3 = 15 × 0.3531466672 ton reg = 5.2972000082 ton reg Popular Volume … WebSub base (2) Package Type Jumbo bag (4) Major bag (4) Usage Concrete, Bedding drainage pipes (2) De-Icing (1) Hardcore / Void filling (1) Hardcore/ Void filing (1) Hardcore/Void filling (1) Making concrete (1) Making concrete and bedding drainage pipes (1) Road & Driveway repair (1) Price £0 - £19.99 (5) £50 - £99.99 (4)

Sub base ton to m3

Did you know?

WebThe sub base is a load-bearing layer of aggregate laid on the sub-grade layer below and is the main load-carrying layer of roads and pavements. Since the sub base distributes weight over a wide area, it provides a very stable layer which reduces sinking and settling of the highway surface. Web20mm aggregate m3 to tonnes:- generally 1 cubic metre of 20mm aggregate weighs around 1550 kg and 1 tonne of aggregate equates as 1000kg, so 20mm aggregate m3 to tonnes …

WebGravel Base Calculator m3/ton Sub Base / Ballast calculator m3/ton Scalpings Sub Base 0-20 mm calculator m3/ton. Enter Post code To see price and selection. Start. Products. Sub Base / Ballast (12) Soil & Dirt (4) Slate (11) Sand (22) ... Enter dimensions in centimeters and calculate the needed amount of Sub Base / Ballast in cubicmeter and tons. WebIf the application warrants a concrete sub-base, it would be wise to consult a paving /concrete contractor, or civil engineer for accurate specification. 1m³ concrete covers 10m² at 100mm thick and 6.5 m² at 150mm thick. Concrete is ordered and delivered by volume, not by weight. Typical Sub-base Designs

Web17 Feb 2011 · Perhaps on reflection 2.1/2.2 t/M3 should be 2.2/2.3 t/M3. Had another OMC/MDD done and the MDD of 2.4 is now 2.2, so I’m going back to 2.1/2.2 t/M3 compacted density in the layer. Remarkably I’ve had 244 hits on my site for type 1 subbase density and 691 for type one subbase, and that’s not all the search variants such as subbase tonnes M3. WebType 1 is a well graded granular sub base material used to construct the base of roads, driveways, and any kind of hard standing area that requires strength in it`s base. It is a well tried and tested stone used for many years as the default base layer material. Type 1 contains a good mix of angular aggregate sized stone from 40mm down to dust.

WebDry sand coarse 1.6 tonnes per cubic metre. Topsoil (some moisture) 1.44 tonnes per cubic metre. Ballast 1.76 tonnes per cubic metre. Gravel MOT Type 1 scalpings 1.92 tonnes per …

WebWe also have Cement Treated Base (CTB), which is our blue metal roadbase, with 3% of cement blended into it. This needs to be spread and compacted within 4 hours of delivery. The ratio to convert tonnage to cubic meters for road base products is roughly 2 tonne equals 1 cubic metre. For example, a full 13 tonne truck load of road base will ... christmas through the decadesWebGravel Base Calculator m3/ton Crushed Limestone calculator m3/ton Class 6F5 Capping Crushed Rock calculator m3/ton Class 6F5 Capping Crushed Rock calculate Change … get off road ltdWebThe weight of Type 3 limestone is 1.5 to 2.2 tonnes per m 3 depending on the level of compaction. What is the specification for Type 3 sub base? Type 3 sub-base is a pure crushed granite, limestone or clean crushed concrete. Usually a 40mm product that has been screened to create a reduced fines aggregate. getoffroadWebScalpings Sub Base 0-20 mm calculate. Enter dimensions in centimeters and calculate the needed amount of Sub Base / Ballast in cubicmeter and tons. Density of Scalpings Sub … christmas through lowell michiganWebSub-base material is produced by crushing either limestone or granite rock. The sub base is designed to evenly spread the load on traffic bearing areas such as pavements and roads. Made up of a load-bearing layer of aggregate, the sub base is laid on the sub-grade layer below. ... Minimum order of 10 Bulk Bags or 10 m3. ENQUIRE NOW 020 8546 ... get off rado boy lyricWebMOT Type 1 Sub Base: 800kg Bulk Bag. An ideal sub base for driveways, paths, patios and paving. Supplied in 0.85/m3 or larger bulk bags. Approximate weight of 800kg. When working out quantities, each bag will cover approximately 14m2, when laid at 40mm deep. Please note that this product is accurately weighed at the time of filling the bags ... get off road leedsWebType 1 Sub-Base 6F2 Capping Available for collection and delivery at competitive prices for prices or more details please call: 01536 418121 or email [email protected] Your Privacy Matters get off progressive mail